MARTA is renovating Indian Creek Station as part of its State of Good Repair program. The most exciting new feature is the new pedestrian bridge that connects to Durham Park Road on the north side of the station. The main bridge span was installed in December 2024 and is scheduled to open in April 2025. Over the next few months, extensive upgrades will be made to the platform, concourse, walls, furniture, elevator, lighting, public artwork, and landscaping, as well as deep cleaning. The project is scheduled for completion in Spring 2025. 

We Value Your Feedback

We appreciate your patience and welcome your feedback on the project and the recent two-day rail suspension while we installed the pedestrian bridge in December 2024. 

Indian Creek Survey - English

PedBridgeInstall_before-after_12092024

Image Description: The above aerial images show MARTA's Indian Creek Station before and after the installation of a new steel pedestrian bridge across the tracks. 

Project Features   

  • A new Pedestrian Bridge for access from Durham Park Road 
  • New wall paneling, metal doors, and door frames 
  • New lighting and illuminated signage at the platform, plaza, and concourse levels 
  • New landscaping, trash receptacles, and benches 
  • Pressure cleaning throughout the station  
  • New copper gutter system  
  • Repairing and refinishing the existing wood barrel ceiling 
  • New concrete at the platform, plaza, and concourse levels  
  • New SMART Restroom for customers, which use technology to keep the facilities safe and maintained.
  • New operator restroom on the platform level  
  • New paving of the parking lot and bus loop, and redesigning for better traffic flow  
  • New roof and wall paneling on the Police Precinct and the Traction Power Substation (TPSS) Building
  • Repair of the windscreens at the platform level  
  • New artwork 

Cleveland Electric continues installing light fixtures

Image Description: A member of the construction crew stands on a ladder, installing new light fixtures above while another crew member watches from the ground below. New lighting hangs from the wooden ceiling in the background. 

new-ramp

Image Description: The image above shows a new wheelchair-accessible ramp completed at the east bus loop at Indian Creek Station. 

Stay Informed

Sign up for email updates!   

Contact

Please submit comments regarding the project
via mail or email to: 
Romon Moultrie, MARTA Project Manager 
rmoultrie@itsmarta.com 
(404) 848-6647